← Hub Download PDF Full inspection Draft addendum Email

1001 W 1st St, Muncie — inspection evidence & re-trade

For Dr. James Bogash · Goldpine Ventures, LLC · 8/2/2026 Complete Home + 7/27 Inspectify (incomplete)

List ~$100k (Zillow/Redfin) · 2022 transfer $68k · Contract $105k · Proposed $80k (note absorbs cut)

Proposed economics

$105,000 → $80,000 · cut on the note only

Unchanged for you: $6,000 cash at close · $500/mo · 2%. Note $99k → $74k. Balloon: successive 12-mo extensions while current (draft addendum). Full mid-point CapEx reserve from the report ~$33k; we’re not asking you to fund that out of pocket.

AnchorFigure
Public list (Zillow / Redfin)~$100,000
Last transfer (12/2022)$68,000
County assessed (recent AA)~$81,000
Contract price (current)$105,000
Proposed contract price$80,000

1. Evidence — what the next operator will underwrite

Flooded basement
Basement — standing water ~2–3" (8/2/2026) Majority of floor not walkable; furnace not fully inspectable. Complete Home Inspections LLC · inspector field: “2–3 in deep… clean out was off… toilet is clogged”
Furnace bay flood
Furnace bay — heat plant on stacked CMU above flood water Day-of field photo · same event
Stepping stones
Stepping stones through water
Open cleanout
Open clean-out + hose in trench Cap removed (report language).
Cleanout cap
Clean-out hardware
Furnace on blocks
Furnace still on blocks (8/3)

Structure / envelope

Brick
Brick / mortar loss Report: serious deterioration on visible foundation walls.
Void
Open void at joist line
Cracks
Cracked mortar + rubble Engineer recommended.
Joist rot
Joist rot Load-bearing member damage.
Bearing
Joist bearing rot
Pier
Ad-hoc CMU pier
Garage roof
Garage — open sheathing Serviceability “questionable.”
Fascia
Fascia — advanced rot
Shingles
Missing / damaged tabs
Chimney
Chimney flash / mortar
Siding
Siding breach — wet sheathing
Siding hole
Siding hole — wood exposed
Downspout
Downspout on ground
Sidewalk
Hardscape failure

2. Diligence timeline (why the package is late)

DateEventOutcome
7/27 Inspectify / Kyrios — first whole-house attempt Incomplete: 24 limitations; basement sealed; unit walk disrupted (person asleep in Unit 1; inspector left). Rebook required. Cost already spent.
8/2 Complete Home Inspections LLC — second full attempt (additional fee) ~2–3" water; clogged toilet; clean-out open; furnace not fully inspected; garage locked. Written report issued.
8/3 Manager supplemental photos Residual damp; furnace still on blocks; garage interior opened.
“The water is around 2–3 in deep. Possible drain pipe issue. Clean out was off the pipe… and one of the toilets is clogged.” — Complete Home Inspections LLC · 8/2 field text

3. CapEx reserves from the report (operator mid-points)

Not sealed bids. Same list any serious operator builds from this PDF.

#ItemMid reserve
1Dry-out / sanitize / re-photo after flood event$1,200
2Plumbing: toilet, clean-out, snake/camera, sewer contingency$4,500
3HVAC re-check once dry$400
4House roof + chimney flash/rebuild above line$9,500
5Garage roof + eave structural$4,000
6Gutters / downspouts / extensions$1,800
7Siding / fascia breaches$2,200
8Brick/mortar spot repair + engineer letter if needed$3,500
9Joist sister / repair$2,500
10Electrical safety (weatherhead, GFCI, panel issues)$1,800
11Life-safety / small items (rails, detectors, doors, walk)$1,600
Sum of mid-points (1–11)~$33,000
Proposed price adjustment (note principal) — negotiated vs full stack−$25,000 → $80k price

4. Proposed paper

Current

  • Price $105,000
  • Cash to seller $6,000
  • Note $99,000 @ 2%
  • $500/mo · residual ~$68.8k

Proposed

  • Price $80,000
  • Cash to seller $6,000 (same)
  • Note $74,000 @ 2%
  • $500/mo (same) · residual ~$40.1k

Balloon / refinance: successive 12-month extensions while note is current and notice is given — so monthly income continues if refi lags after CapEx. Uncapped-while-current in the draft; 5-year hard cap available if counsel wants a ceiling. Full text in draft addendum (discussion only).

Commission / PM fee: not part of this re-trade. If listing compensation is fixed by brokerage agreement, the note cut carries the inspection economics. Access/coordination failures on diligence are a separate conversation if useful later.

5. Bottom line